Monday, July 27, 2015

KNIGHT/CROWN/LINNEMAN

Work Completed Last Week:

 

·         Knight Street, Crown Lane and Crown Drive

  • Water main was chlorinated and tested on Knight St., Crown Ln. and Crown Dr.  During the process the fire hydrants were flushed and water samples taken.

Thank you for all your patience and understanding as the work continues.

 

          Linneman Street

  •  Water main installation began on Linneman St. from Wedel Ln. to Meadowlark Ln.  This work included installation by open cut trenching on the west portion of the project and directional drilling on the east portion of the project.
  • Fire hydrant and valve installation also began on Linneman St. between Wedel Ln. and Prairie Lawn Rd.

 

Work Anticipated This Week:

 

·         Knight Street, Crown Lane and Crown Drive

  •  Water service installation will begin on Knight St., Crown Ln., and Crown Dr.                        Thank you for your patience as construction continues on your street.

 

·         Linneman Street

  • A. Lamp is scheduled to complete water main and fire hydrant installation on Linneman St.
  • A. Lamp will begin testing and chlorinating the water main on Linneman St.

 Thank you for all your patience and understanding as water main work continues.

 

Monday, July 20, 2015

KNIGHT/CROWN/LINNEMAN

Work Completed Last Week:

 

·         Knight Street, Crown Lane and Crown Drive

  • Water main and fire hydrant installation was completed On Knight St., Crown Ln. An Crown Dr.
  • Water main and fire hydrant installation was completed on Knight St., Crown Ln. An Crown Dr.
  • Water main was pressure tested and chlorinated.
  • Storm sewer and sanitary sewer spot repairs were completed On Knight St., Crown Ln. An Crown Dr.

Thank you for all your patience and understanding suing this work.

 

          Linneman Street

  •  No work at this time.

 

Work Anticipated This Week:

 

·         Knight Street, Crown Lane and Crown Drive

  •  Water main on Knight St., Crown Ln. and Crown Dr. will be sampled and tested. 

Work onsite may be slow this week while we wait for satisfactory water samples. Thank you for your patience this work.

 

·         Linneman Street

  • A. Lamp will begin water main and fire hydrant installation on Linneman St. by Wedel St. by open excavation.
  • A. Lamp will also have a subcontractor onsite installing water main on Linneman St. by directional drilling method.

 Thank you for all your patience and understanding during this work.

 

Friday, July 10, 2015

Work Completed Last Week:

 

·         Knight Street, Crown Lane and Crown Drive

  • Water main and fire hydrant installation continued on Knight St.from Crown St. south to the dead end and on Crown Dr. from Knight St. to Crown St.

Thank you for all your patience and understanding as the water main installation continues.

 

          Linneman Street

  •  No work at this time.

 

Work Anticipated This Week:

 

·         Knight Street, Crown Lane and Crown Drive

  •  Water main on Knight St., Crown St. and Crown Dr. will be filled with water, pressure tested, chlorinated and water samples tested. 
  • Storm sewer and sanitary sewer will be repaired in various locations on Knight St., Crown St., and Crown Dr.

Crews may be in multiple locations in one day this week due to the smaller size of the storm and sanitary sewer repairs.  Thank you for your patience during this work.

 

·         Linneman Street

·       A. Lamp is scheduled to begin mobilization of equipment and traffic control.

Monday, July 6, 2015

Water main construction continues.


Work Completed Last Week:

 

·         Knight Street, Crown Lane and Crown Drive

  • Water main installation continued on Knight St. from Pfingsten Rd. to Crown Dr. and on Crown St. from Knight St. south.

Thank you for all your patience and understanding as the water main installation continues.




          Linneman Street
  •  No work at this time.



Work Anticipated This Week:



·         Knight Street, Crown Lane and Crown Drive

  •  Water main installation on Crown St. from Knight St. to dead end and on Crown Dr. from Knight St. to Crown St.

  • Water main pressure test on portions of the water main on Knight St.



·         Linneman Street


o   No work anticipated.