Work Completed Last Week:


·         Knight Street, Crown Lane and Crown Drive


Removal of existing curb and gutter and sidewalk on the north side of Knight St., the east side of Crown Ln., and the east/north side Crown Dr.


o   Installation of curb and gutter and sidewalk on the north side of Knight St., the east side of Crown Ln., and the east/north side Crown Dr.
 



·         Linneman Street
 
Installation of asphalt patching along water main trench.


o   Installation asphalt surface on Linneman St. from Wedel Ln. to Meadowlark Ln.



Work Anticipated This Week:


·         Knight Street, Crown Lane and Crown Drive


o    Removal of existing curb and gutter and sidewalk on the south side of Knight St., the west side of Crown Ln., and the west/south side Crown Dr.


o   Installation of curb and gutter and sidewalk on the north side of Knight St., the east side of Crown Ln., and the east/north side Crown Dr.

o   Existing asphalt surface removal.
 
o   Installation of asphalt patching along water main and sewer trenches on Knight St., Crown Ln., and Crown Dr.


 
·         Linneman Street


o   Installation of traffic gate on Linneman St. between Prairie Lawn Rd. and Rolling Pass.